ALL PROJECTS
All the projects for Infrastructure Development of the schools under Sambhota Tibetan Schools Society.
CLICK HERE FOR MORE INFORMATIONPROJECT IN-PROCESS
Projects in-progress for Infrastructure Development of the schools under Sambhota Tibetan Schools Society.
CLICK HERE FOR MORE INFORMATIONCOMPLETED PROJECTS
Completed projects for Infrastructure Development of the schools under Sambhota Tibetan Schools Society.
CLICK HERE FOR MORE INFORMATIONFUND REQUIRED
All the projects for Infrastructure Development of the schools under Sambhota Tibetan Schools Society.
CLICK HERE FOR MORE INFORMATION
SAMBHOTA TIBETAN SCHOOLS SOCIETY
Infrastructure Development Projects
Last Update: 09, April, 2025
* Project detail with proposal will be submitted after confirmation of support.
Completed projects April, 2024 - March, 2025
S. No. | PROJECT | Target School | LOCATION | STATUS | YEAR | BUDGET REQUESTED (Rs.) | GRANT SOURCE | COUNTRY |
1 | Construction of 5 new staff quarters | Tezu | Arunachal Pradesh | Completed | 2024-2025 | 74,58,648 | TAWS | India |
2 | Renovation of concrete stand classrooms, Installation of 5 taps in Science lab, drainage cover near library and concrete ground; Installation of protection fence on class room balcony & Installation of Protection mesh fencing, 30 wash basin, protection grill & toilet behind staff room | Petoen | Himachal Pradesh | Completed | 2024-2025 | 15,25,367 | TAWS | India |
3 | Re-Construction of road inside school Campus (• 6” pearl layer (height), 50 ft long breadth 13ft. and 37 ft long breadth 19 ft. • Girl hostel side - 121ft. long breadth 8ft. and path 10ft.X4ft. • Water tank side - 150ft. long breadth 5ft. Main road- 1481ft. long breadth 12ft.) | Petoen | Himachal Pradesh | Completed | 2024-2025 | 22,41,500 | TAWS | India |
4 | Renovation of 12 staff quarters - Petoen (at Gamru) (replacement of roof sheet & drainage) | Petoen | Himachal Pradesh | Completed | 2024-2025 | 2,58,983 | TAWS | India |
5 | Renovation of 53 staff quarters - Petoen (at TTS) (5 Buildings outside and 26 quarters inside ) | Petoen | Himachal Pradesh | Completed | 2024-2025 | 25,14,383 | TAWS | India |
6 | Renovation of Classrooms & 11 staff quarters - Gangkyi Petoen (replacement of ceiling sheet to PVC Ceiling sheet in classroom, balcony & toilet bathroom) | Gangkyi Petoen | Himachal Pradesh | Completed | 2024-2025 | 12,59,969 | TAWS | India |
7 | Installation of tin-sheet over classrooms (77 feet long and 41 feet breath, Tata green sheet 0.62mm) | Sheral Gatsel Lobling | Himachal Pradesh | Completed | 2024-2025 | 15,24,831 | TAWS | India |
8 | Installation of tin-sheet over boys & girls hostel (replacement of metal roofing and ceiling of boys and girls hostel to .60 mm green sheet) | Sheral Gatsel Lobling | Himachal Pradesh | Completed | 2024-2025 | 10,11,833 | TAWS | India |
9 | Hostel & school renovation (• Repair of stairs of girl hostels • school buildings gutter repaired and extension of roofs • Senior boys hostel study room floor repaired • Plinth protection at Primary block • Repair the junior boys main electric board system) | Shimla | Himachal Pradesh | Completed | 2024-2025 | 19,40,708 | TAWS | India |
10 | School & hostel toilet renovation (both boys & girls) (4 Junior boys hostel, 4 Primary boys' & 3 girls' toilet, 6 toilet in class 12 area with wash basin, day scholar girls toilet fixing doors & wash basin &d 3 water tank of 1000 ltr & boy toilet wash basin water pipe join with main sewage pipe) | Shimla | Himachal Pradesh | Completed | 2024-2025 | 13,67,931 | TAWS | India |
11 | Drainage renovation at Science laboratory | Mundgod Sr. | Karnataka | Completed | 2024-2025 | 2,97,000 | TAWS | India |
12 | 5 staff quarters installation of tin-sheet (4 staff quarters & Principal quarter - intalling new roof tin sheets ) | Mundgod Sr. | Karnataka | Completed | 2024-2025 | 5,72,551 | TAWS | India |
13 | Re-model of girls hostel dining hall | Mundgod Sr. | Karnataka | Completed | 2024-2025 | 24,95,000 | TAWS | India |
14 | Renovation of Boys Hostel Water leakage | Mundgod Sr. | Karnataka | Completed | 2024-2025 | 9,98,000 | TAWS | India |
15 | Electrical re-wiring of the school & 4 street lights | Gothangaon | Gondia, Maharashtra | Completed | 2024-2025 | 2,35,632 | TAWS | India |
16 | Renovation of 4 staff qtrs new canal, boundary wall at right side wall & canal, slope behind the hostel & water tank fitting | Manali | Himachal Pradesh | Completed | 2024-2025 | 9,55,080 | TAWS | India |
17 | White washing of classrooms & 11 staff quarters (inside & outside) - Gangkyi | Gangkyi Petoen | Himachal Pradesh | Completed | 2024-2025 | 9,25,838 | TAWS | India |
18 | White washing of 17 staff quarters - Petoen (at Gamru) | Petoen (Gamru) | Himachal Pradesh | Completed | 2024-2025 | 5,72,618 | TAWS | India |
19 | White washing of 53 staff quarters - Petoen at TTS (26 staff quarters inside & 5 Buildings outside) | Petoen (TTS) | Himachal Pradesh | Completed | 2024-2025 | 16,30,493 | TAWS | India |
20 | White washing of school building (outside) | Kalimpong | West Bengal | Completed | 2024-2025 | 6,85,613 | TAWS | India |
21 | White washing of classrooms & staff quarters (classroom, hostel ( girls & boys), kitchen, prayer hall and staff quarters) | Shimla | Himachal Pradesh | Completed | 2024-2025 | 19,48,191 | TAWS | India |
22 | White washing of boundary wall | Bir | Himachal Pradesh | Completed | 2024-2025 | 2,24,532 | TAWS | India |
23 | White washing at school & staff quarters | Darjeeling | West Bengal | Completed | 2024-2025 | 44,82,009 | TAWS | India |
24 | White washing of School | Tezu | Arunachal Pradesh | Completed | 2024-2025 | 7,67,000 | TAWS | India |
25 | White washing of 16 classrooms (inside only) | Gurupura | Karnataka | Completed | 2024-2025 | 8,50,000 | TAWS | India |
26 | White washing of boundary wall | Kollegal | Karnataka | Completed | 2024-2025 | 4,01,300 | TAWS | India |
27 | White washing of kitchen & boundary wall | Kailashpura | Karnataka | Completed | 2024-2025 | 70,000 | TAWS | India |
28 | Renovation of 11 rooms west-side old school building block | Bylakuppe | Karnataka | Completed | 2024-2025 | 30,93,866 | TAWS | India |
29 | Renovation of staff quarters | Bylakuppe | Karnataka | Completed | 2024-2025 | 5,24,470 | TAWS | India |
30 | Renovation prayer hall & school auditorium | Shimla | Himachal Pradesh | Completed | 2024-2025 | 5,26,240 | TAWS | India |
31 | Renovation of staff quarters | Shimla | Himachal Pradesh | Completed | 2024-2025 | 20,65,193 | TAWS | India |
32 | Renovation of door and windows of 12 blocks | Shimla | Himachal Pradesh | Completed | 2024-2025 | 13,90,158 | TAWS | India |
33 | Contruction of new children park | Shimla | Himachal Pradesh | Completed | 2024-2025 | 5,22,123 | TAWS | India |
34 | Roofing at kitchen and boy's bathroom | Darjeeling | West Bengal | Completed | 2024-2025 | 4,27,160 | TAWS | India |
35 | Contruction of new children park | Darjeeling | West Bengal | Completed | 2024-2025 | 15,07,999 | TAWS | India |
36 | Iron fencing in school campus | Mundgod Sr. | Karnataka | Completed | 2024-2025 | 4,48,400 | TAWS | India |
37 | Renovaton of school's toilet | Mundgod Sr. | Karnataka | Completed | 2024-2025 | 12,69,720 | TAWS | India |
38 | Interlocking tiles | Mundgod Sr. | Karnataka | Completed | 2024-2025 | 6,21,772 | TAWS | India |
39 | Renovation of 4 Departments | Mundgod Sr. | Karnataka | Completed | 2024-2025 | 17,96,930 | TAWS | India |
40 | Partition of office | Mundgod Sr. | Karnataka | Completed | 2024-2025 | 1,86,750 | TAWS | India |
41 | School beautification | Mundgod Sr. | Karnataka | Completed | 2024-2025 | 7,18,723 | TAWS | India |
42 | A cover sitting area park | Mundgod Sr. | Karnataka | Completed | 2024-2025 | 7,55,000 | TAWS | India |
43 | Sheet roofing for outdoor play yard | Mundgod- PPRT | Karnataka | Completed | 2024-2025 | 7,63,575 | TAWS | India |
44 | Installation of children park | Lobersing | Odisha | Completed | 2024-2025 | 6,54,247 | TAWS | India |
45 | Renovation of kitchen cum dining hall | Arlikumari | Karnataka | Completed | 2024-2025 | 5,00,000 | TAWS | India |
46 | Renovation of Kitchen roof | Kailashpura | Karnataka | Completed | 2024-2025 | 4,00,000 | TAWS | India |
47 | Renovation of Director & Deputy Director's staff quarters | Petoen | Himachal Pradesh | Completed | 2024-2025 | 13,28,198 | TAWS | India |
48 | Installation of JSW Sheet on children playground | Gurupura | Karnataka | Completed | 2024-2025 | 4,10,040 | TAWS | India |
49 | Renovation of school toilet | Tezu | Arunachal Pradesh | Completed | 2024-2025 | 3,49,752 | TAWS | India |
50 | Renovation of girl hostel toilet and bathroom | Mussoorie | Uttarakhand | Completed | 2024-2025 | 8,67,536 | TAWS | India |
51 | Installation of new new roof sheet at UKG Play ground | Tenzingang | Arunachal Pradesh | Completed | 2024-2025 | 7,44,000 | TAWS | India |
52 | Iron fencing at football ground | Tenzingang | Arunachal Pradesh | Completed | 2024-2025 | 7,63,500 | TAWS | India |
53 | Procurement of furniture in 2 staff quarters (Bed-6 (2 double & 4 single), chair-4, table-2, mattresses-6) | Tenzingang | Arunachal Pradesh | Completed | 2024-2025 | 69,941 | TRAS | India |
54 | Procurement of solar lights | Mundgod (branch) | Karnataka | Completed | 2024-2025 | 1,78,238 | IO | Germany |
55 | Privacy in the girls hostel (Wooden partition) | Petoen (TTS) | Himachal Pradesh | Completed | 2024-2025 | 7,26,064 | Tibet Freunde | Swiss |
56 | Procurement of school bus | Mundgod Sr. | Karnataka | Completed | 2024-2025 | 16,45,854 | GAT | Germany |
57 | Supplementary diet (Apr to July, '24) | Mundgod Sr. | Karnataka | Completed | 2024-2025 | 1,65,343 | FOTSI | USA |
58 | Supplementary diet (Aug '24 to Mar '25) | Mundgod Sr. | Karnataka | 3,55,440 | FOTSI | USA | ||
59 | White washing of classrooms | Tezu | Arunachal Pradesh | Completed | 2024-2025 | 3,02,505 | TRAS | Canada |
60 | Renovation & white washing of office building | Ravangla | Sikkim | Completed | 2024-2025 | 3,17,376 | LTDM | France |
61 | Staff Qtrs building reno. & white washing | Ravangla | Sikkim | Completed | 2024-2025 | 11,89,609 | LTDM | France |
62 | Classroom Building reno. & white washing | Ravangla | Sikkim | Completed | 2024-2025 | 6,19,324 | LTDM | France |
63 | Supplementary diet | Miao | Arunachal Pradesh | Completed | 2024-2025 | 1,30,339 | TRAS | Canada |
64 | Procurement of Children's Play Items | Petoen | Himachal Pradesh | Completed | 2024-2025 | 5,03,010 | Tibet Freunde | Swiss |
65 | Procurement of water Filter | Darjeeling | West Bengal | Completed | 2024-2025 | 1,32,750 | Fonds De Detotion | France |
66 | Invertor for school computer lab & office | Tezu | Arunachal Pradesh | Completed | 2024-2025 | 52,000 | Fonds De Detotion | France |
67 | Purchase of 5,000 ltrs of water tank | Tezu | Arunachal Pradesh | Completed | 2024-2025 | 1,03,550 | Fonds De Detotion | France |
68 | Games & Sports Room renovation | Darjeeling | West Bengal | Completed | 2024-2025 | 6,63,934 | Tibet Freunde, Swiss | Swiss |
69 | Pre-Primary renovation | Darjeeling | West Bengal | Completed | 2024-2025 | 9,02,399 | Tibet Freunde, Swiss | Swiss |
70 | Library books | Miao | Arunachal Pradesh | Completed | 2024-2025 | 69,977 | TRAS | Canada |
71 | Library books | Tenzingang | Arunachal Pradesh | Completed | 2024-2025 | 69,977 | TRAS | Canada |
72 | Library books | Tezu | Arunachal Pradesh | Completed | 2024-2025 | 33,980 | TRAS | Canada |
73 | Hostel expenses | Petoen | Himachal Pradesh | Completed | 2024-2025 | 3,95,771 | GAT | Germany |
74 | Installation of 10 solar light | Miao | Arunachal Pradesh | Completed | 2024-2025 | 2,13,396 | Fonds De | France |
75 | Dish wash and drinking water open shed | Miao | Arunachal Pradesh | Completed | 2024-2025 | 4,49,505 | Fonds De | France |
76 | Children's park | Bir | Himachal Pradesh | Completed | 2024-2025 | 3,90,900 | GAT | Germany |
77 | Re-painting of the Prayer wheel & school gate | Petoen | Himachal Pradesh | Completed | 2024-2025 | 3,90,957 | Tibet Freunde | Swiss |
78 | Educational expenses | Petoen | Himachal Pradesh | Completed | 2024-2025 | 5,59,352 | ASIA Onlus | Italy |
79 | Renovation of boys hostel (Floor work, Stone grinding, terrace area & wall net) | Mussoorie | Uttarakhand | Completed | 2024-2025 | 18,28,809 | Woeser Foundation | Italy |
80 | Renovation of staff Qtrs kitchen slab, toilet & bathrooms | Tenzingang | Arunachal Pradesh | Completed | 2024-2025 | 2,91,063 | Fonds De | France |
81 | Construction of new infant (UKG) toilets | Tenzingang | Arunachal Pradesh | Completed | 2024-2025 | 8,80,962 | Fonds De | France |
82 | Procurement of Kitchen Appliances | Shimla | Himachal Pradesh | Completed | 2024-2025 | 2,73,668 | Tibet Freunde | Swiss |
83 | Water filter | Chandragiri | Odisha | Completed | 2024-2025 | 2,23,600 | Tibet Freunde | Swiss |
84 | Supplementary diet report of Vimala Assoc. | Miao | Arunachal Pradesh | Completed | 2024-2025 | 1,72,493 | Vimala Assoc. | Swiss |
85 | Supplementary diet report | Miao | Arunachal Pradesh | Completed | 2024-2025 | 10,162 | Fonds De Detotion | France |
86 | Supplementary diet report | Gurupura | Karnataka | Completed | 2024-2025 | 1,29,370 | Vimala Assoc. | Swiss |
87 | Office renovation | Darjeeling | West Bengal | Completed | 2024-2025 | 5,75,022 | Tibet Freunde | Swiss |
88 | Office furnture (Table, chair & almirah) | Darjeeling | West Bengal | Completed | 2024-2025 | 1,16,590 | Tibet Freunde | Swiss |
89 | Iron Fencing around school campus | Puruwala | Himachal Pradesh | Completed | 2024-2025 | 2,50,000 | Tibet Freunde | Swiss |
90 | Installation of children's park | Tezu | Arunachal Pradesh | Completed | 2024-2025 | 7,65,727 | Fonds De | France |
91 | Construction of 12 new staff quarters | Mundgod Sr. | Karnataka | Completed | 2023-2025 | 1,78,59,580 | TAWS | India |
92 | Construction of 10 new staff quarters | Miao | Arunachal Pradesh | Completed | 2023-2025 | 1,25,08,000 | TAWS & GAT | India & Germany |
93 | Interlocking tiles & tin-sheet installation at toilet | Gulledhala | Karnataka | Completed | 2024-2025 | 7,49,738 | Vimala Assoc. | Swiss |
1 | Supplementary diet (DoE) (Apr '24 - Feb '25) | Tezi | Arunachal Pradesh | STSS | 2024-2025 | 1,30,939 | Le Toit | France |
2 | Supplementary diet (STSS) (Aug - Nov '24) | Tezu | Arunachal Pradesh | STSS | 2024-2025 | 1,76,660 | Le Toit | France |
3 | Supplementary diet (DoE) (Apr - June '24) | Ravangla | Sikkim | STSS | 2024-2025 | 50,915 | Le Toit | France |
4 | Supplementary diet (STSS) (Aug '24 - Feb '25) | Ravangla | Sikkim | STSS | 2024-2025 | 1,08,037 | Le Toit | France |
5 | Supplementary diet (STSS) (Sept - Nov, '24) | Petoen School | Himachal Pradesh | STSS | 2024-2025 | 2,41,971 | OOT, Taiwan | Taiwan |
6 | Supplementary diet (STSS) (July - Oct, '24) | Petoen School | Himachal Pradesh | STSS | 2024-2025 | 5,50,971 | GAT | Germany |
7 | Supplementary diet (STSS) (Nov, '24) | Petoen School | Himachal Pradesh | STSS | 2024-2025 | 8,040 | Tibet Fund | USA |
8 | Supplementary diet (STSS) (Jun - Aug, '24) | Miao | Arunachal Pradesh | STSS | 2024-2025 | 1,30,339 | TRAS | Canada |
9 | Supplementary diet (DoE) (Mar, '24) | Miao | Arunachal Pradesh | STSS | 2024-2025 | 9,552 | Fonds De Detotion | France |
10 | Supplementary diet (DoE) (Apr - Dec, '24) | Miao | Arunachal Pradesh | STSS | 2024-2025 | 1,72,493 | Vimala Assoc | Swiss |
11 | Supplementary diet (DoE) (Apr '24 - Mar '25) | Kollegal | Karnataka | TSO | 2024-2025 | 1,76,052 | Vimala Assoc | Swiss |
12 | Supplementary diet (DoE) (Apr '24 - Mar '25) | Gulledhala | Karnataka | STSS | 2024-2025 | 1,29,370 | Vimala Assoc | Swiss |
13 | Supplementary diet (DoE) (Apr '24 - Feb '25) | Bylakuppe | Karnataka | TSO | 2024-2025 | 1,72,493 | Vimala Assoc | Swiss |
14 | Supplementary diet (DoE) (Apr - Mar, '25) | CVP Bylakuppe | Karnataka | STSS | 2024-2025 | 3,24,299 | Vimala Assoc | Swiss |
15 | Supplementary diet (DoE) (Apr '24 - Feb '25) | CVP Bylakuppe | Karnataka | TSO | 2024-2025 | 4,80,147 | Lama Soepa Rinpoche | France |